Sort Out
Cars and trucks were sorted into piles for salvage.
Scrap Heap
Car bodies were piled up near an access road so the torches could be brought in.
Track Laying
The ground was graded then track segments were brought in and bolted together.
Balast Train
Balast was dumped and the balast train ran back and forth frequently to tamp it down.
Clean Up
Dump trucks and bulldozers were then brought in to clean up the coal and haul it away.
Job Done
After the track had been straightened and leveled, the rails were welded together and the joints removed.